How Your CMT Order Moves Through Our Factory

Six stages from fabric receipt to dispatch. You know what happens, when, and who checks it.

Stock photo - factory images coming soon

Before production

Step 0 — Quote and sampling

Every order starts with your tech pack. We confirm feasibility, send a CMT quote, and make samples. Sample lead time: 2 working days after fabric and tech pack are received.

  1. Proto sample

    First version to check construction.

  2. Fit sample

    Adjusted to your fit comments.

  3. Size set

    Full size range to confirm grading.

  4. PP (pre-production) sample

    Final approved sample. Bulk matches this.

Six stages

Six stages of production

  1. Stage 01 / 06

    Fabric received

    Your fabric arrives at our store. We count rolls, check shade lots, and inspect for visible defects. Any issue is reported to you the same day.

    Check: Quantity, shade, defects.

  2. Stage 02 / 06

    Cutting

    Fabric is relaxed (knit) or spread flat (woven). Markers are planned for best yield. Panels are cut, numbered and bundled by size.

    Check: Panel measurement, ply alignment, bundle count.

  3. Stage 03 / 06

    Stitching

    Bundles move to the knit or woven line. Each operator handles one operation. In-line checkers inspect at [TBD] points per line.

    Check: Seam quality, stitch density, measurement.

  4. Stage 04 / 06

    Finishing

    Threads are trimmed. Garments are pressed, spot-cleaned if needed, and labelled with main, care and size labels.

    Check: Press quality, stains, label placement.

  5. Stage 05 / 06

    Packing

    Garments are folded, polybagged and packed into cartons as per your packing list. Cartons are marked and weighed.

    Check: Ratio per carton, marks, carton count.

  6. Stage 06 / 06

    Dispatch

    Cartons are handed to your forwarder or our transport for Karachi port or Lahore airport. Packing list and documents are shared the same day.

    Check: Final AQL 2.5 audit before loading.

Timeline

Typical timeline

We confirm your delivery date in writing before cutting starts.

Typical CMT order timeline
StageDuration
Quote2 working days
Sampling2 working days
Bulk production500 pieces within 5 working days after fabric and trims are received; larger orders scheduled on request
Final QC & packing[TBD] days
Transit to Karachi[TBD] days

Communication

You always know where your order is

  • Weekly status report with photos and quantities.

  • Same-day alert for any fabric or trim issue.

  • One contact person for the whole order.

  • WhatsApp: +92 300 0448869 · Email: junaid@lahajam.com

FAQs

Process questions, answered

  • What do I need to send to start production?

    A tech pack (or reference garment), fabric, trims (or trim specs), size and colour breakdown, and packing instructions.

  • Can I approve samples remotely?

    Yes. We courier samples to you and share measurement sheets and photos. Most buyers approve by email or WhatsApp.

  • What happens if fabric arrives short or defective?

    We report it to you the same day with photos. We do not cut until you confirm how to proceed.

  • Do you provide production updates?

    Yes. Weekly updates as standard, daily on request.

  • Who handles shipping?

    You can nominate your own forwarder, or we arrange transport to Karachi port or Lahore airport. Export documentation support is [TBD].

Start with a sample

Send your tech pack. We will confirm feasibility and cost your first sample.